WGI Icon_Green (1)
WGI Projects
Project Experience

Learn more about successful projects from some of our clients.

Plan Your Next Project!

Kick-start your next project with this quick step-by-step intake form.
About
WGI

WGI is a national design firm creatively transforming infrastructure and real estate through tech-driven services.

Our
Locations

You’ve seen our award-winning team, proven expertise, and industry authority. Now let’s make your next project a success.

Meet Our
Leadership Team

Our Executive Leadership Team and Practice Area Leaders bring decades of experience and client successes to your next project.

Our Practice Area Leadership

Our nationwide team of engineers, surveyors, planners, and architects offers
market-leading experience.

Firm Registrations

WGI holds nationwide registrations to perform engineering, surveying, architecture, and environmental science services.
WGI
Insights Blog

Our blog covers client interests like infrastructure, real estate, regulations, and smart, connected communities.

Whitepapers & Publications

Our whitepapers highlight our design experts' innovative insights and best practices for the AEC industry.

News &
Press Releases

Dedicated to your success, we invite you to subscribe to our newsletter for the latest news, case studies, and insights.

WGI
Media Room

Our passionate design professionals frequently share their expertise at webinars and virtual events.

Post Tags

Houston/Harris County Detention, Drainage, and Floodplain Updates – 2019

Many factors contributing to the design and analysis of stormwater infrastructure and detention have been updated this year to include: detention rates, drainage determination, and floodplain mitigation, which have been a result of new NOAA Atlas 14 Precipitation-Frequency Data (Link to NOAA Precipitation Frequency Data). Flood map These changes are effective immediately and will result in an increased detention pond volume and underground storm infrastructure. A summary of these changes are illustrated below:

Detention Rates Harris County

Outfall Location/Method*:

  • Underground System – 0.75 ac-ft/ac
  • Roadside Ditch – 1.00 ac-ft/ac
  • Pump – 1.00 ac-ft/ac
*Reference Section 6.03.1.2 of the Harris County Design Manual City of Houston Tract Size**:
  • < 1 ac. – 0.20 ac-ft/ac
  • 1 ac. < A <50 ac. – 0.50 ac-ft/ac
**Reference Section 9.2.01.H of the City of Houston IDM Storm Infrastructure Sizing – is based on the updated Atlas 14 rainfall data. Reference Table 9.1 in the City of Houston IDM. Flood mapping request Floodplain Mitigation Although Floodplain mitigation/regulations have not been updated since January 2018 (Harris County) and September 2018 (City of Houston), the impacts are significant and costly. City of Houston The effective areas include both the 100 and 500-year floodplain and yield zero net fill across the site. Zero net fill can result in structures being on an elevated foundation with crawl space or piers and additional detention volume or cut throughout the site. Foundations within the 500-year floodplain must be a minimum of two feet greater than the floodplain elevation. Harris County Fill may not be utilized in elevating structures, rather open foundations/piers are allowed in the 100 and 500-year floodplain. Minimum finished floor elevations (FFE) for the 100-year are 2’ about BFE and 1’ above BFE for the 500-year (Shaded Zone X only). Zones other than Shaded Zone X generally have greater restrictions for minimum FFE elevations. Like the City of Houston, Zero Net Fill is required within the 500-year floodplain.