WGI Icon_Green (1)
WGI Projects
Project Experience

Learn more about successful projects from some of our clients.

Plan Your Next Project!

Kick-start your next project with this quick step-by-step intake form.
About
WGI

WGI is a national design firm creatively transforming infrastructure and real estate through tech-driven services.

Our
Locations

You’ve seen our award-winning team, proven expertise, and industry authority. Now let’s make your next project a success.

Meet Our
Leadership Team

Our Executive Leadership Team and Practice Area Leaders bring decades of experience and client successes to your next project.

Our Practice Area Leadership

Our nationwide team of engineers, surveyors, planners, and architects offers
market-leading experience.

Firm Registrations

WGI holds nationwide registrations to perform engineering, surveying, architecture, and environmental science services.
WGI
Insights Blog

Our blog covers client interests like infrastructure, real estate, regulations, and smart, connected communities.

Whitepapers & Publications

Our whitepapers highlight our design experts' innovative insights and best practices for the AEC industry.

News &
Press Releases

Dedicated to your success, we invite you to subscribe to our newsletter for the latest news, case studies, and insights.

WGI
Media Room

Our passionate design professionals frequently share their expertise at webinars and virtual events.

Post Tags

I-75 Design-Build from South of SR 50 to Hernando/Sumter County Line

The American Council of Engineering Companies of Florida (ACEC-FL) annually recognizes outstanding achievements by its members in accomplishing the Florida Department of Transportation (FDOT) studies and projects. WGI teamed with Middlesex Corporation to deliver this $94M Design-Build project to widen and reconstruct six miles of I-75 in Hernando County. The project includes reconstruction of the interchange at US 98/SR 50/Cortez Boulevard to a Single Point Urban Interchange (SPUI) configuration. I 75 DBThis major design-build project alleviated regional congestion by adding capacity to six miles of I-75. WGI and its build partner widened I-75 from four lanes to six, making accommodations and permitting offsite ponds for a future eight-lane roadway. The project's design improved functionality during construction, through coordination with local agencies and stakeholders, and in its final condition, with increased capacity and optimized signalization. I 75 DB The project's bridges over the Withlacoochee State Trail and River were built without impacts to the environment. WGI's design reduced fill by 300,000 yards, eliminated 20,000 truck deliveries, and reduced future maintenance and mowing.