WGI Icon_Green (1)
WGI Projects
Project Experience

Learn more about successful projects from some of our clients.

Plan Your Next Project!

Kick-start your next project with this quick step-by-step intake form.
About
WGI

WGI is a national design firm creatively transforming infrastructure and real estate through tech-driven services.

Our
Locations

You’ve seen our award-winning team, proven expertise, and industry authority. Now let’s make your next project a success.

Meet Our
Leadership Team

Our Executive Leadership Team and Practice Area Leaders bring decades of experience and client successes to your next project.

Our Practice Area Leadership

Our nationwide team of engineers, surveyors, planners, and architects offers
market-leading experience.

Firm Registrations

WGI holds nationwide registrations to perform engineering, surveying, architecture, and environmental science services.
WGI
Insights Blog

Our blog covers client interests like infrastructure, real estate, regulations, and smart, connected communities.

Whitepapers & Publications

Our whitepapers highlight our design experts' innovative insights and best practices for the AEC industry.

News &
Press Releases

Dedicated to your success, we invite you to subscribe to our newsletter for the latest news, case studies, and insights.

WGI
Media Room

Our passionate design professionals frequently share their expertise at webinars and virtual events.

Post Tags

Design and Construction at Omni Resort and Country Club – Austin, TX

WGI teamed up with The Beck Group for a $150 Million renovation and expansion of the Omni Barton Creek Resort. Located in southwest Austin, Texas, the project includes the renovation of an existing guest tower, restaurant, member’s clubhouse, central laundry plant, pool area, guest check-in area, and clubhouse. In addition, several new buildings will be constructed: a new guest tower, parking garage, conference center and ballroom, golf pro shop, and events pavilion.  WGI provided MEP (mechanical, electrical, plumbing) engineering services for the project. [caption id="attachment_26529" align="alignnone" width="768"]Omni Barton Creek Resort Figure 1: Entrance to the resort and country club[/caption] During design, weekly ‘Big Room’ meetings were held at the architect’s office. Architectural, construction, MEP, structural, civil, landscape, food service, and communications team members were all present to discuss incremental design milestones, deadlines, and any ongoing design or budget issues that needed to be resolved. These regular meetings helped to facilitate communication among all of the team members and helped resolve issues in a timely manner. The delivery method for the MEP design on this project was “design assist” between the MEP engineers and contractor. This is a form of design practice that allows the contractor to be heavily involved in the later stages of the process by providing insight into cost and constructability implications of different design configurations. Meetings between the engineers and contractors were frequent.  The contractor’s BIM team utilized our MEP drawings and design knowledge to construct 3D plans for the field. It was often a give-and-take process between the engineer and contractor to divvy out scope responsibility to ensure work was not overlapped and scope holes were avoided. [caption id="attachment_26530" align="alignnone" width="768"]Omni Barton Creek Resort MEP design Figure 2: View from janitor closet looking up at the mechanical mezzanine[/caption] An existing pavilion space was renovated to become a restaurant. Many existing air handling and fan coil units serving the existing space were in poor condition. The design team worked closely with the resort’s maintenance personnel to see which equipment could be reused, relocated, or replaced. This proved to be a balancing act that included factors such as equipment condition, budgetary constraints, and re-use practicality. In some cases, the resort’s maintenance personnel were able to make the replacement a part of the yearly up-keep budget, as to not affect the current project’s budget. The Omni Barton Creek Resort utilizes a central cooling system with condensers located near the entrance to the resort. As part of the design, the condensers were replaced to provide an increased capacity to support the additional buildings in the resort. It was imperative that the design team account for the size of both the existing resort’s cooling load and the new cooling load’s central cooling system. This was challenging due to the fact that architectural programming was not finalized prior to determining what size cooling plant to provide. [caption id="attachment_26531" align="alignnone" width="768"]Omni Barton Creek Resort MEP design Figure 3: The central chiller plant. In the background, elevated tennis courts with parking below.[/caption] Another challenge was replacing a domestic hot water boiler in the existing tower. The existing conventional boilers were removed and replaced with a high-efficiency condensing boiler rack system. With the existing boiler room being located on the lowest level of the existing tower, it took much coordination to find a route for intake and combustion flues to be routed. It was necessary for the architect to design furr-outs and chases to get the piping to the exterior of the building. [caption id="attachment_26532" align="alignnone" width="768"]Omni Barton Creek Resort MEP design Figure 4: New high-efficiency, condensing water heater rack system to serve existing guest tower.[/caption] From weekly meetings with the design team and contractors early on in construction, the team was able to get a comfort level with one another and were able to hash-out problems as they arose. [caption id="attachment_26533" align="alignnone" width="768"]Omni Barton Creek Resort MEP design Figure 5: Stand-alone pavilion for private events.[/caption] In closing, you can be sure that we will be with you during the entire design and construction process to ensure that a quality product is delivered to the owner. The Omni Barton Creek resort is scheduled to re-open in early summer 2019.